MENU

Sections

  • Home
  • About
    • Contact Us
    • Editors and Writers
    • Join our Mailing List
    • Letters to Editor Policy
    • Advertising & Underwriting
    • Code of Ethics
    • Privacy
    • Talbot Spy Terms of Use
  • Art and Design
  • Culture and Local Life
  • Public Affairs
    • Ecosystem
    • Education
    • Health
    • Senior Life
  • Community Opinion
  • Sign up for Free Subscription
  • Donate to the Talbot Spy
  • Cambridge Spy

More

  • Support the Spy
  • About Spy Community Media
  • Advertising with the Spy
  • Subscribe
June 19, 2025

Talbot Spy

Nonpartisan Education-based News for Talbot County Community

  • Home
  • About
    • Contact Us
    • Editors and Writers
    • Join our Mailing List
    • Letters to Editor Policy
    • Advertising & Underwriting
    • Code of Ethics
    • Privacy
    • Talbot Spy Terms of Use
  • Art and Design
  • Culture and Local Life
  • Public Affairs
    • Ecosystem
    • Education
    • Health
    • Senior Life
  • Community Opinion
  • Sign up for Free Subscription
  • Donate to the Talbot Spy
  • Cambridge Spy
Archives

Bay Bridge Update

February 15, 2020 by Spy Desk

Share

The Maryland Transportation Authority (MDTA) will close the center lane of the westbound Bay Bridge Tuesday, Feb. 18, through Friday, Feb. 21, any time between 10 a.m. and 2:45 p.m. daily, weather and traffic volumes permitting. Crews will take advantage of lower winter traffic volumes and warmer temperatures to advance the rehabilitation of the westbound right lane while avoiding morning and afternoon rush hours. The center lane closures will give crews a safe work zone to pour concrete onto the westbound right lane.

We encourage drivers to plan extra time in your travel, especially if you’re traveling to a scheduled appointment. MDTA will continue to monitor weather forecasts. Should conditions permit, crews will move this daytime work to overnight hours to minimize impacts to bridge customers.

During the center lane closures, the remaining lane will be 11 feet wide, meaning wide loads – vehicles wider than 10 feet – will be prohibited. Operators of wide-load vehicles should adjust westbound travel times and can sign up for email and text alerts at mdta.maryland.gov and subscribe to #BayBridgeWork for commercial vehicle notifications.

Any cancellations of these closures will be announced through these alerts and MDTA social media accounts.

The Spy Newspapers may periodically employ the assistance of artificial intelligence (AI) to enhance the clarity and accuracy of our content.

Filed Under: Archives

Safe Sitter® Class Set for March 7 in Easton Spy Moment: Fire and Ice Catches on in Easton

Write a Letter to the Editor on this Article

We encourage readers to offer their point of view on this article by submitting the following form. Editing is sometimes necessary and is done at the discretion of the editorial staff.

Copyright © 2025

Affiliated News

  • The Chestertown Spy
  • The Talbot Spy

Sections

  • Arts
  • Culture
  • Ecosystem
  • Education
  • Mid-Shore Health
  • Culture and Local Life
  • Shore Recovery
  • Spy Senior Nation

Spy Community Media

  • Subscribe
  • Contact Us
  • Advertising & Underwriting

Copyright © 2025 · Spy Community Media Child Theme on Genesis Framework · WordPress · Log in